You are not on the FEMA website.  TOUCH FEMA home to go to the FEMA official website.

[CONSERVATIONTECH.COM-Home]     [ FEMA home (www.FEMA.gov) | FEMA Library (www.fema.gov/library/index.jsp)]


WEB-BASED HANDBOOK (Legacy Edition). CLICK HERE to submit comments.
Because of staff changes and Randolph Langenbach's retirement from FEMA, these handbooks were never published on the FEMA website.  These are the only copies available.


 FEMA HAZARD MITIGATION
 HANDBOOK SERIES

-----HOME PAGE-----


 

 EARTHQUAKE HANDBOOK
________________________________ 
 
    Introduction
 
    
Symbols and Keywords
 
 I.       BUILDING STRUCTURES
     A.    Introduction

    B.    Intro to Seismic Upgrading

    C.    Structural Concepts  

        C1. Technical Commentary (1)

        C2. Technical Commentary (2)

    D.    Step 1: Risk Assessment

        D1. Upgrade Priority

        D2. Geographical Risk

        D3. Building Structural Types

        D4. Year of Construction

        D5. Load-path Assets+Debits

        D6. Rapid Visual Survey Sheet
     E.    Step 2: Mitigation Measures

 

II.      UTILITY SYSTEMS

    A.     Introduction

    B.     Utility Mitigation Measures

 

 Appendices
     A.      Regulations
     B.      Glossary

     C.      Acronyms
     D.      References
     E.      List of Contributors

Reinforce Building With Cross Bracing

Full-height, steel cross bracing can increase a building’s capacity to withstand seismic forces. Cross bracing can be exterior or interior and is secured to the building at floor level. 

Effectiveness:

  • Somewhat to very effective, depending on pre-disaster building condition and the extent of cross bracing.
  • Increase effectiveness by tying exterior walls to the floors.

Limitations:

  • Foundation must be able to support bracing. 
  • Multi-story cross bracing is less effective than cross bracing at each floor level.
 

NOTE:  None of the mitigation measures in these Handbooks should be considered ‘pre-approved’ or otherwise automatically eligible for FEMA funding. Only FEMA staff can determine eligibility, once they have determined that an applicant is eligible and they have reviewed a project proposal.